EĞLENCE II HEPP / 27.2 MWe Egenda Ege Energy Production Co.
Company Information
Legal Entity
Egenda Ege Power Production Co.
Investment Cost
72.472.380 TL/40.930.973 $
Annual Production Capacity
78 GWh/Year
Installed Capacity
28 MWm / 27,2 MWe
Facility Type
Hydroelectric (River Type)
License Acquired
27.12.2007
Location (Province/District)
Adana / Karaisalı
Commercial Operation
April 2013
Operational Model/Duration
Production / 49 Year
Unit Type/Manufacturer
Francis (Vertical)/Flovel
Number of Units
3 (5,23 + 2 x 10,98 MWe)
Net Head and Flow Rate
169 m – 17,4 m3/sec
Connection Type
Substation 154 kV – 19.8 km